Structured Cabling
Cat6 / Cat6A office and equipment-room copper cabling with labels and per-link tests.
Suitable for
For Hong Kong office fit-outs or refits that need maintainable copper from desks, meeting rooms, and wireless AP positions back to the rack — typically one floor, with a clear floor plan and agreed point count.
Scope
Structured cabling is the backbone of a maintainable office network. We design and install copper runs — typically Cat6 or Cat6A — from workstations, meeting rooms, and wireless access points back to the rack. Before pulling cable we confirm the floor plan, point counts, faceplate locations, containment path, and patch-panel capacity. Both ends are labelled to the same scheme, and each link is tested so you have a record for the next contractor.
Typical scope: • Horizontal copper to the agreed points • Patch panels and tidy rack dress • Faceplates and patch cords as specified • Per-link test results • As-built point list for handover
Fibre backbone is separate when floors or rooms need it — see our Fibre Optic service. Containment by others, landlord works, and active equipment supply are out of scope unless written in.
Deliverables
What you typically receive: • Dual-end labels matching the agreed scheme • Per-link test results • As-built point list • Rack / patch-panel photos or a short layout note • Handover pack the next contractor can follow
Process
1. Enquiry — floor plan or sketch, rough point count 2. Site / drawing review — routes, rack location, containment 3. Written scope and quote 4. Install — pull, terminate, dress 5. Test — every agreed copper link 6. Handover — labels, results, point list
Typical timeline
For a typical single-floor office cabling package, allow about 2–3 working days on site once materials and access are ready. Evening or weekend work can be arranged when the building allows — confirm in the written scope. Larger point counts or multi-room racks take longer.
After handover
Workmanship on the agreed install can be raised with us after handover. Damage by other trades, later moves, or changes by others is quoted separately.